Projects

Wade Group have completed many different projects. Refer to a range of examples below.

School Landscaping and Play Areas

Cedars Primary School, Blackburn 
St Boniface R.C Primary School, Salford 
Dallam Community Primary School, Warrington


We have carried out various landscaping projects for schools across the North West. 
They have included:
- Dallam Community Primary: Installation of new surfacing in both soft play, artificial grass and tarmac as well as new edgings, new fencing and gates. Improvements to the existing drainage system were carried out along with installation of new drainage. These works were carefully planned and closely controlled to avoid disruption to the on-looking classrooms along with the use of noise controlled equipment.
- Cedars Primary School: This project comprised of several aspects which included tarmac surfacing, coloured tarmac surfacing, timber decking areas, creating landscaping mounds,  artificial turf and installing playground equipment including a sand pit, climbing frame and a climbing wall fitted with pedagogs.
- St Boniface Primary School: Creation of a natural landscaped outdoor play area consisting of a mound/ rock  formation with a tunnel feature. 

Samlesbury Weir Removal 

Samlesbury - River Ribble


Removal of a redundant gauging weir on the River Ribble at Samlesbury. The weir was a concrete flat V type weir with two baffle walls, with the downstream weir face finishing with a vertical face at the apron. On the right-hand bank there was a stilling well and land drainage outlet, the stilling well was filled and capped. Works were completed from left hand bank to reduce ground disturbance to Brockholes Nature Reserve site. The banks immediately adjacent to the site were reprofiled after the removal of the weir in keeping with the natural gradient of surrounding banks. The left-hand bank was reprofiled 100m up from the removed structure to reinstate riverbank and mitigate erosion potential from water level reductions. Through this project, we salvaged and recycled the arisings from the concrete weir and crushed it off-site to create recycled 6F2 sub-base material that was used on various other projects. 

Ribble Valley Holiday Construction

Ribble Valley Holiday Homes


Construction of 7 luxurious holiday cottages, clad in random stone and with blue slate roofs. Properties range from a 2-bedroom bungalow to an 8-bedroom detached house. Each property is built to an individual design, they have extensive landscaping, communal areas featuring an ornamental waterfall and external hot tubs installed in each garden with pergola roofs and external lighting. Each cottage is finished to a very high specification. The flooring throughout is finished in either polished porcelain tiles or engineered oak floorboards. Each cottage has underfloor heating, bi-folding aluminium doors, oak staircases, and glass balustrading, designed to flood the stairwells with light. All the doors, skirting and architraves are all in solid oak and the windows are double glazed units in aluminium frames. We installed fully fitted kitchens with integrated appliances and granite worktops. They comprised of traditional strip footings with ground bearing slabs. The project included refurbishment of existing office space to provide additional amenities for guests. See website: www.ribblevalleyholidayhomes.co.uk

School Community Building Construction

Tottington High School, Bury 
 
Full refurbishment of the existing Laurels building.
Works included full strip out mechanical and electrical components as well as cubicles, flooring, wall tiles and all fixtures. We then demolished the existing blockwork privacy walls within the girls and boys toilets and construction 2no. door openings within the existing corridor wall  supported with concrete lintels. All walls were plastered and decorated and a timber suspended ceiling was installed spanning the full length. New flooring was fitted throughout the building and new cubicles were fitted within the w/c areas. 

Installation of a School All-Weather Exercise Track

Dallam Community Primary School


Within Dallam Primary, we created a new golden mile track that followed the perimeter of the school's rear playing field. As well as this we created 2 concrete bases to allow for storage containers. 

Works included:
- Excavation of path 2m wide 
- Disposal of soil WAC (Waste Acceptance Criteria) test carried out 
- Import of MOT Type 1 sub-base
- Two coat tarmac system installed comprising of binder course and surface course

Car Park Extension

Astley Park


We were appointed to extend the car park at Astley Park in Chorley.
The works consisted of reducing ground levels and transporting large quantities of excavated soil to designated depot. We implemented a traffic management plan for the duration of the works as the car park was still live and adjacent to a primary school and various other busy locations. We carried out resurfacing of the footpaths and roadways, including installation of new kerbs, edgings and tactile paving at crossing points. We also installation 2no. height restriction barriers along with new bow top fencing. Our final piece of work was to construct the speed hump table that can be seen when entering the Astley Park car park on Hall Gate, finishing the car park with thermoplastic line markings.

Agricultural Build

Ribchester


In Ribchester we constructed a large agricultural building. ThIs consisted of a reinforced concrete slab foundation, including services; electricity, water and soil pipe outlet connected to existing pit. A steel frame, block work base and timber boarding to the underside and corrugated sheet roofing with rain water goods. 

Stone Path Upgrade

King George V Playing Fields, High Walton 


We carried out works to upgrade and extend the existing footpath surrounding the King George V Playing Fields. The works included: widening works to existing footpath network, creation of a new loop section in the woodland area, removal of old street furniture and installation of new street furniture, deep cleaning to railings and old street furniture and works to entrance feature area. 

Car Park Refurbishment

St Clares RC Primary School, Manchester


At St Clares RC Primary School, Manchester we excavated and removed a large flagged area and a large tarmacked area and installed new tarmacking, area. These works involved installation of new edgings to all areas. Re-setting manhole lids. Over-banding between new and old tarmacking. Removal of existing thermoplastic line markings with preparation of existing surfaces and the use of tack coat. As with all works carried out at schools, we were conscientious with deliveries of materials, avoiding busy periods. Health and safety of the school users was paramount. 

Office Refurbishment

Smufit Kappa


At Smurfit Kappa, a large recycling centre in Blackburn, we carried out the refurbishment of the offices. This work entailed the strip out of the existing floor coverings. Removal of existing external windows, strip out of the existing kitchenette. Installation of new windows, new partition walls, and a new kitchen along with associated M & E works. Additional mechanical and electrical works included, replacement of toilet bowls, installation of electric heaters, a new fire alarm, emergency lighting, new hand dryers and new above ground plumbing for new toilets. Alteration to existing toilet cubicles. New floor coverings throughout. Plastering and decoration works throughout. Works to the existing flat roof, this entailed applying Aquapol, a waterproofing agent. 

Office Building Construction

Clayton-le-dale


At Queens Street, in Great Harwood, we resurfaced an existing roundabout with cobbles and flint resin bonded macadam. Along with installation of new tactile paving to pedestrian road crossings and new thermoplastic line markings. This was a busy junction where traffic management and safety of both the public and our operators was a key element of the project

Farm Yard Cottage Improvements

Worden Park, Leyland


We  completed the refurbishment of St Josephs RC High School, Bolton in which the corridor area throughout the ground floor of the school along with the main staircase were refurbished. These works comprised on new flooring to the full length of the ground floor corridor as well as the stair cases.  The existing screed has to be broken out to facilitate the newly installed damp proof membrane and screed. We installed new double doors to the corridor which were fire rated treated softwood.  The corridor walls were re-plastered and painted, existing classroom doors were fitted with new ironmongery. These works provided the school with a modern rejuvenation. 

 Creation of footpaths

Chorley Cemetery


 We completed works constructing new roads and resurfacing designated footways within Chorley Cemetery. 
    In order to reduce visual and noise disturbance to the cemetery, we carried out the works in phases, with the site working zone moving from one area to the next following completion of works. 
  The project comprised installing geotextile membrane to compacted ground. Installing pressure treated timber edgings with pointed stakes to both sides of footpaths. The sub-base was graded with a 3t excavator and we imported MOT Type 1 sub-base and compacted in layers with our 80 tandem vibrating roller. The footpaths were completed by hand laying AC20 binder course macadam to 60mm thickness, and AC6 surface course macadem to 20mm thickness.
   As part of the project, we installed drainage elements including manholes and gullies with drainage pipe laid throughout. For the carriage way elements, pre-cast concrete kerbs were embedded into concrete haunching and we machine laid with AC32 binder course macadam to 80mm thickness, and surface course macadam to 30mm thickness.
   
 

Landscaping of Church Gardens

St Mary's Church, Ambleside


We acted as principle contractors on a large landscaping project, carrying out works to the surrounding gardens and car parks. The works involved pecking out rock outcrop creating more space. Tree felling, clearance of shrubs and vegetation, isolation of existing electrics, breaking out of slate edgings, protection and relocation of gravestones, repairs to damaged stone plinth. Installation of drainage gullies. Widening of existing tarmac access road and tarmac car park, new pathway construction using resin bonded surfacing, installation of new Burlington heritage style slate edgings. Repairs to retaining walls, clean and re-bedding of existing steps. Installation of illuminated bollards, new flood lighting to outside of church and installation of drive-over lights. Installation of a bespoke curved steel bench, and cycle stands. Installation of decorative boulders, soft landscaping and extensive tree and shrubbery planting. 

Town Centre Landscaping

Kendal


We completed the landscaping of a public space, converting it from what was originally used as an open space and car park, to a landscaped area, incorporating grass pathways, lighting, guardrails and street furniture. We split the total area of works into four separate phases. This allowed us to complete phases as we went along, reducing the risk of disturbance to the entire site. 

The works comprised of uplifting the existing tarmac surface with the use of a planer.  We reduced the ground levels of the area and infill with MOT Type 1 sub-base, provided by a local aggregate supplier. 

Following on, we installed soil and turf to the required areas, and installed guard rails adjacent to the river side and road side. 
The final phasing of works was the surface overlay with a two coat tarmac system. When carrying out job further afield from our local area, we like to provide and promote the local communities and take pride in offering our works to them for the duration of the project. 

Footpath and cycleway creation

Lancaster University 


At Lancaster University Campus we carried out groundworks to retrofit sustainable drainage systems including swales, filter drains and detention
basins. There was a small existing path in-situ with we extended in width by 1m and created new paths to the campus covering approx. 600m in length. The works included installation of concrete edgings to entire perimeter, importing of stone and tarmac surfacing. 

Car Park Landscaping and Ground works

Forest Hills, Lancaster


Completion of a landscaping and resurfacing project, located in the countryside at Forrest Hills, LA2 0PL, a popular wedding venue, owned by Lancaster University.
The main works involved soft and hard landscaping, creating car parking bays using telegraph poles, extensive land drainage installations, installation of a gabion basket retaining wall, re-flagging, building new access steps, installing street furniture, installation of a concrete base for a bin store and adjustments to existing guttering. 

Civil Engineering

The Italian Orchard


For The Italian Orchard restaurant based in Broughton, Preston we created a new access road. As part of the groundworks, we were required to install kerbing, drainage, electricity duct and 63mm water main to the full length of the access road, 335m in length. 

Hard and Soft Landscaping 

Walmer Bridge


The project was to repair and replace existing surfaces, including off-street parking, provide new tree and shrub planting and new street furniture to shop frontages. 

The works included laying bitmac surfacing, sub-bases, drop kerbs, repairing existing road kerbs, installing steel bollards, benches, a cycle hoop and sculptural feature, planting ornamental grasses and shrubs and planting trees in planters
 
The area in which the site was located was part of the village centre surrounded by residential developments. Care was taken to keep disruption to a minimum. 
Ornamental grasses, trees and street furniture were added at a later stage.

New Paragraph

Civic Centre Refurbishment

South Ribble Office, Leyland


We carried out refurbishment of their offices based in Leyland. The aim of the project was to renovate the Civic suite of the council offices. 

The project aimed to modernise the appearance of the space with the inclusion of natural light and the use of a light modern colour pallet. Further to this, modernisation of toilet facilities and reconfiguration of the central bar into a meeting room was included. 

Wade Group Offices

Clayton-le-dale, Blackburn



Flagship building has now been completed, a stone structure, comprising of steel frame and concrete deck. The first floor houses 2no. large offices on a mezzanine floor. One office overlooks the warehouse. The warehouse opens up into a concrete yard space through 3no. roller shutter doors.


The outdoor space comprises of a spacious car park to fit 26no. cars, a concrete yard space for deliveries


The yard is surrounded with mesh fencing and 2no. double vehicle gates that separate the two outdoor spaces.



The Westleigh School

Westleigh 



We completed an extension to the existing Laurels building, we extended the dining room and the school classrooms.






Share by: